Past Projects

This page is under construction all documents can be found 

HERE

Past Projects

1A IHS to Mile Lane

Overview:  MassDOT paved from IHS to Mile Lane.  The board recommended 10’ 6” travel lanes with a defined shoulder for cyclists.  


Review Documents:

  • Initial Review:

    • <link>

1A Mile Lane to Rowley


Overview: MassDOT paved from Mile Lane to the Rowley town line.  There was no plan to review, but the board recommended 10’ 6” travel lanes with a defined shoulder for cyclists.

Lord Square

Overview:  The Town of Ipswich is working on sidewalk and crosswalk for the area around Lord’s Square.  The board reviewed the plans.


Review Documents:

  • Initial Review:

    • Link

Mill Road

Overview:  The Town of Ipswich paved Mill Road with funding from the state Transportation Improvement Plan (TIP).  The board reviewed the plans.  The state denied requests to narrow the travel lanes to make space for pedestrians and cyclists.


Review Documents:

  • Initial Review:

    • Link

Topsfield Road

Overview:  The Town of Ipswich resurfaced Topsfield Road.  This project took place prior to the creation of the Pedestrian and Cyclist Advisory Board.  The Cycle Safe Working Group conducted a public site visit with DPW.